Creating Roll Film. To deliver a legitimately created negative in a sunshine tank, the temperature and span of the procedure must be precisely directed. By and large, a temperature of 68 degrees F (20 degrees C) is prescribed for high contrast film designers and other preparing arrangements. Contingent upon the film and engineer blend, prescribed creating times may differ from a fe
Transcripts
Slide 1

Creating Roll Film

Slide 2

Developing Roll Film to deliver a legitimately created negative in a light tank, the temperature and length of the procedure must be deliberately managed. For the most part, a temperature of 68 degrees F (20 degrees C) is suggested for high contrast film designers and other preparing arrangements. Contingent upon the film and engineer mix, prescribed creating times may fluctuate from a couple to a few minutes. Picture takers frequently utilize a clock with a chime or bell at this stage.

Slide 3

Development During advancement the arrangement is intermittently unsettled - delicately sloshed around- - to guarantee uniform improvement and to keep streaks from framing on the film. Experienced picture takers for the most part foment on the same time plan for each move of film the process. 

Slide 4

Development In a darkroom or changing bag where you have set a  film tank, reel, focus insert  and scissors expel the cap  from the level end of our move film cartridge. Evacuate the inward reel and trim the film pioneer off of the film. Handle the film just by the edges or even better utilize cotton gloves to maintain a strategic distance from fingerprints on the film surface

Slide 5

Developing Tanks

Slide 6

Development In the DARK, put the tank reel so that the supplement confronts far from you. Feel for the knocks on the inward side of the reel. That is the begin of  the reel winding that will hold the film  Insert the level end of the film into the winding and draw it about most of the way around the reel. At that point contort the top reel while holding the base reel still. This will push the film into the reel. Keep this  up until the end of the roll is  reached.  Cut the tape and  plastic reel off and you are finished.

Slide 7

Development Place the reel into the tank with the plastic addition face up.  Notice that the cover on the tank fits into the focal point of the supplement. Place the top on the tank and bend it clock shrewd until it clicks close. You are currently allowed to bring the tank out of the dull for handling.

Slide 8

An Enlarger

Slide 9

Steps for preparing film 1. Blend your designer. In this lab we utilize HC 110 from a stock arrangement weakened 1.5 oz. with 10.5 oz. of water to make a sum of 12 oz. For a two move tank this is multiplied.

Slide 10

Steps for handling film   2. Take the temperature of the engineer and look on one of the preparing diagrams in the lab to discover the time.  DO NOT expect it will be something another person got.

Slide 11

Temperature Normal Contrast 20% less differentiation 20% more complexity TRI - X 64 9 1/4 minutes 6 min 11 minutes 66 8 minutes 5 minutes 9 3/4 minutes 68 - perfect 7  1/2 minutes 4  1/2 minutes 10  1/2 minutes 70 6  3/4  minutes 4 minutes 8 minutes 72 6 minutes 3  1/2 minutes 7 1/4 minutes 74 5  1/4 minutes Avoid 6 1/2 minutes 76 5 minutes Avoid 6 minutes Other Films T - MAX 100 PLUS-X 65 8 minutes 6 1/2 minutes 68 7 minutes 6 minutes 70 6 1/2 minutes 5  1/2 minutes Processing Chart

Slide 12

Steps for preparing film 3. Empty the blend into the highest point of the film tank. Tenderly tap the tank on the table 10 or 12 times to remove air from the side of the film.  Start the time when you begin pouring in the engineer.

Slide 13

Developing Station

Slide 14

Steps for preparing film 4. Amid your advancement time which will probably be somewhere around 8 and 12 minutes get the tank at regular intervals and shake it  for 5 seconds to upset the engineer. This will get crisp concoction contact with the film. Inability to disturb could bring about your film to be low interestingly.

Slide 15

Steps for handling film 5. With 15 seconds left on your time start to spill out the engineer. With the cover still on the tank wash it out with water from the sink.  Be certain the temperature of the water is the same as it was the point at which you blended the designer. Extremely frosty or high temp water can bring about the grain to get bigger on your film.

Slide 16

Steps for preparing film   6. Pour in 12 oz. of fixer from the jug. Again tap the tank to shake off the air and set the opportunity to 10 minutes. Amid the 10 minutes you ought to keep on agitating at regular intervals, albeit a few picture takers don\'t think this is as basic as it is on the engineer.

Slide 17

Steps for preparing film 7. Toward the end of the 10 minute time empty the fixer BACK into the container. Try not to pour it down the channel.

Slide 18

Steps for preparing film 8. With the cover on the tank, top the tank off with water and discharge it 2 times. At that point evacuate the tank cover and take out the reel and place it in the clothes washer sink where it will be washed in running water for 15 minutes least. A 30 minute wash would be ideal if time grants.

Slide 19

Steps for preparing film 9. Toward the end of the wash haul the film reel out and DIP it in the photograph stream arrangement, then draw the film from the roll and expel it to hang it up.  It will take around a hour to dry.