GSA: American Recovery & Reinvestment Act John Leatherman GSA R8 Regional Recovery Team

Slide 2

Presentation Overview Who is GSA? What does the Recovery Act intend to GSA? GSA\'s point of view on patterns, opportunities, and systems amid recuperation. Depiction of particular Recovery ventures in Colorado. Recuperation Act Resources Tips on utilizing FedBizOpps

Slide 3

Who is GSA? We give workspaces, items and administrations for the government group Own/lease 8,600 properties Provide workspaces for more than 1M elected laborers

Slide 4

Rocky Mountain Region-Region 8

Slide 5

Recovery Act - How Projects were Selected Energy Savings Potential Projects that have been composed or are in configuration with an emphasis on making high performing, vitality sparing structures. Rate of Delivery Projects that can be produced and honored rapidly (extends must be recompensed by 3.31.10) Projects that can be finished before 2015

Slide 6

What does the Recovery Act intend to GSA? National: $5.55B all out subsidizing for Federal Buildings. $1.05B - New development $750M: Federal Buildings and U.S. Courthouses $300M: Land Ports of Entry $4.5B – Modernization/High-Performance Green Building Projects Limited Scope/High-Performance Green Building Projects (Recommissioning, Lighting, Updated Controls, Mechanical Equipment, and so forth)

Slide 7

What does the Recovery Act intend to Region 8? R8 all out Recovery Act stores got: $426,527,000 1 new development venture = $79,989 (Billings, MT Courthouse) 15 restricted extension ventures = $70,053,000 4 modernization ventures = $276,485,000

Slide 8

Colorado Recovery Act Project List

Slide 9

Trends & Strategies During Recovery The government has assumed an exceedingly useful part in the development of "green" structures: GSA requires confirmation of each recently built working in its stock to LEED measures. GSA additionally requires LEED affirmation for private division structures built through GSA leases. GSA\'s system amid Recovery: By putting resources into accumulation of base ventures we can: Help invigorate employments in the development and land segments, Stimulate long haul development in vitality effective advancements, elective vitality arrangements and green structures How are framework ventures animating development in green advances?

Slide 10

Trends & Strategies During Recovery GSA is invigorating development by obliging adherence to the Minimum-Performance High Performing Green Building criteria: This criteria is fused in the underlying checking of all Recovery ventures, both existing building and new development. This criteria incorporates features from: Guiding Principles for Sustainable Existing Buildings http://www.wbdg.org/sustainableEO ). Certain procurements of EISA (Energy Independence & Security Act of 2007) Buildings with adequate aggregate degree to acquire a LEED rating must accomplish a LEED Silver affirmation, at any rate. MPC Checklist guarantees a "green" task

Slide 11

Trends & Strategies During Recovery $4.5 B concentrated on elite green building ventures GSA is a demonstrating ground for green innovations Includes such changes as: Renewable vitality—photovoltaics and wind Cool Roofs (R50) Windows Lighting substitution High-execution building frameworks (High Efficiency HVAC Equipment) Advanced metering

Slide 12

Denver Federal Center Photovoltaic Project Two Phased Project-Phase One: Phase 1 is a Roof Mounted PV Array situated at Buildings 20, 56, 810 on the Federal Center. The PV exhibits will cover around 19 sections of land of rooftop. Joined limit of the PV clusters is approximately 3 Megawatts Generate 4,115,000 kWh every year Save about $300,000 in power cost every year. This period of the undertaking has been secured as an outline/manufacture little business put aside and was recompensed December sixteenth, 2009 to Centerre E Light, A Joint Venture, LLC.

Slide 13

Denver Federal Center Photovoltaic Project Two Phased Project-Phase Two: Ground Mounted and Car Port Photovoltaic System has yet to be granted Two ground mounted sunlight based PV exhibits at two diverse locales One 13 sections of land site and one 3 section of land site Combined limit of both ground destinations will be roughly 2 megawatts Will deliver around 3,565,000 kWh every year Save about $260,000 in power cost every year Phase 2 of the venture is an outline/fabricate little business put aside and is booked for honor in mid-March, 2010.

Slide 14

Opportunities Recovery Opportunities R8\'s Recovery Act Projects-Design/Build Most undertakings under sales or recompensed Limited subcontract opportunities may exist Check FedBizzOpps.gov Non-Recovery Act An/E I.D.I.Q contracts 5 yr contracts with min. recompenses and 1,2,3 million roofs GSA (Regional & National), Park Service, DOD, and so forth… Other configuration offer form or plan/assemble extends All posted on FedBizOpps.gov

Slide 15

Opportunities Summarized Recovery Act work Check FedBizOpps.gov ( www.fbo.gov ) Select recuperation opportunities Advanced hunt NAICS codes-541310-541490 (Architectural & Engineering Codes) Classification codes Y & Z (development and modifications) Non Recovery Act work Check FedBizOpps.gov ( www.fbo.gov ) See above

Slide 21

Where would I be able to get more data? www.fedbizopps.gov www.recovery.gov www.gsa.gov/recuperation

Slide 22

www.gsa.gov/recuperation

Slide 23

Pennie Estrada Director, Small Business Utilization Center DFC 234 Lakewood, CO 80225 Phone: (303) 236-7409 Fax: (303) 236-7552 Email: pennie.estrada@gsa.gov

Slide 24

John Leatherman Community Business Center Manager Denver Federal Center, Building 41 Phone: (303) 236-8000 ext. 3037 Email: john.leatherman@gsa.gov