Part 7 Schedule Control .


68 views
Uploaded on:
Description
Section 7 Plan Control. Learning Targets. Perform the progressions in the task control process Decide the impacts of real timetable execution on the venture plan Consolidate venture changes into the calendar Compute an overhauled venture plan Control the undertaking plan. 2.
Transcripts
Slide 1

Section 7 Schedule Control

Slide 2

Learning Objectives Perform the means in the venture control handle Determine the impacts of real timetable execution on the venture plan Incorporate venture changes into the calendar Calculate a refreshed venture plan Control the venture plan 2

Slide 3

Real World Example Vignette: Mars Pathfinder Motto: Better, speedier, less expensive Three year improvement cycle with a $150 million cost top, oversaw by Jet Propulsion Laboratory. Basic 30 day dispatch window happens just at regular intervals. Extend finished on-time and under-spending plan. 2.5 gigabytes of information; about 17,000 camera pictures; and 8.5 million individual temperature, weight, and wind estimations were recorded. 3

Slide 4

Real World Example Vignette: Pinnacol Assurance – A Denver-based Medical Insurance Provider Current framework was a calamity with enormous overabundances and every day excessive charges of more than $5,000. Another venture was begun with a six month time period and an improvement staff of two dozen. No venture administration standards were connected and the venture spiraled wild. After twelve months nothing had been conveyed and employments were hanging in the balance. A venture re-begin was started with clear goals and controls. This time the due date never moved! 4

Slide 5

Project Control Process The way to powerful venture control is to quantify real advance and contrast it with arranged advance on a convenient and standard premise and to make vital restorative move quickly. Set up a customary revealing period. Amid each revealing period, gather: information on real execution data on any progressions to venture degree, timetable and spending plan. In the event that progressions are consolidated, another arrangement must be built up. 5

Slide 6

Effects of Actual Schedule Performance Actual complete circumstances (AFT) of finished exercises will decide the soonest begin and most punctual complete circumstances for the rest of the exercises. 6

Slide 7

Incorporating Project Changes into the Schedule Changes may be started by the client or the venture group, or they may be the consequence of an unforeseen event. The level of effect may rely on upon when the progressions are asked. At the point when the client asks for a change, extra expenses may should be charged. 7

Slide 8

Updating the Project Schedule A refreshed venture timetable can be figured in light of real complete circumstances of finished exercises 8

Slide 9

Approaches to Schedule Control Four Steps Analyze the calendar Decide what remedial moves ought to be made, if any Revise the arrangement Recalculate the calendar 9

Slide 10

Approaches to Schedule Control (Cont.) An adjustment in the evaluated length of any action will bring about a comparing change in the slack for that way. At the point when a way of exercises has negative slack, concentrate on: Activities that are close term. Exercises that have since quite a while ago evaluated lengths. 10

Slide 11

Reducing the Estimated Durations Apply more assets. Relegate a man with more noteworthy skill to perform or help with the movement. Lessen the extension or prerequisites for an action. Thoroughly wipe out a few exercises. Increment profitability through enhanced techniques or innovation. 11

Slide 12

Approaches to Schedule Control (Cont.) Reducing lengths of exercises more often than not brings about an expansion in expenses or a decrease in extension. The key is to successfully address ways with negative or falling apart slack values when they are distinguished. 12

Slide 13

Schedule Control for Information Systems Development Common important changes amid IS improvement ventures: Changes to information screens Changes to reports Changes to on-line inquiries Changes to database structures Changes to programming preparing schedules Changes to handling speeds 13

Slide 14

Project Management Software The product permits you to perform different control capacities. The percent finish for each undertaking can be entered. Changes to the term assessments can be entered. The product will naturally overhaul the venture plan and the comparing system graphs. 14