PC Room Requirements for High Density Rack Mounted Servers Rhys Newman Oxford University

Slide 2

Outline Why do we require PC rooms? Why previously. Why later on. Configuration of nature. Cooling Humidity Power Proposal at Oxford Physics Conclusion

Slide 3

Why do we require them (Past) Security Equipment is profitable. Comfort Specialist Knowledge is expected to care for them. Systems administration was moderately troublesome. Mass A solitary (helpful) establishment was extensive

Slide 4

Why we require them (future) Specialist Environmental Requirements High thickness suggests more touchy. Comfort Human time expense of programming upkeep. Will be required for the quick future, yet the Grid will diminish the need long haul.

Slide 5

Cooling - Then Rack mounting intended to get high CPU thickness – advance space use given the exertion expected to distribute secure office. Up to this point, most extreme force utilization was around 2-3kw for each rack. Air cooling adequate, cool air taken straightforwardly from under the floor. Indeed, even traditional aerating and cooling on the roof was frequently enough.

Slide 6

Cooling Now: an excessive amount of Success! Cutting edge 1U servers are 300W warmers => 12KW for every rack (18KW for edge servers). Dependable guideline: 1000 liters/sec of cool air can deal with 12KW. In point of interest a Dell 1750 utilizations 1200 l/min. For 40 racks, this is 32000 l/sec which in a run of the mill 600mm pipe is a wind pace of 320km/hr!

Slide 7

Cooling - Solutions Focus on wind current! Place racks in lines – hot walkway, icy path. Leave entryways off the racks. Distinguish hotspots statically, or powerfully (HP brilliant cooling). General guideline: air cooling can oversee 1200W/m 2

Slide 8

Major Problem – no value for money As the processor speeds increment => They get more sweltering => Fewer can exist per sqr meter => Overall CPU influence in datacentre goes DOWN. This regardless of how well you plan the air cooling frameworks!

Slide 9

Cooling Solution II Try independent frameworks. Attempt water cooled units (independent or something else). Use "more astute" frameworks which effectively oversee hotspots. HP keen cooling cases to get up to 2.5KW/m 2 along these lines (??).

Slide 10

Humidity Computers (in a datacentre) have more tightly resistances than people – 45%-55% (in spite of producer points of confinement of 8%-80%). Too low, chances static eletricity (fans in the PCs themselves cause this). Too high, restricted buildup, erosion and electrical short. Note: Zinc in floor tiles! Cooling units must be superior to for typical workplaces – what number of rooms use routine units? No enchantment shot of just importing outer air and venting it to the outside!!!

Slide 11

Power All this warmth originates from the force supply 1.2A for each server 50A for every rack 4000A for a 40 rack focus And for the cooling frameworks, a sum of 5000A => 1.25 MW.

Slide 12

Summary in this way… . Present day machines require an all around planned physical environment to get the most out of them. Most present offices are no more appropriate (a late thing). Intel scrapped 2 chip lines to focus on lower power chips, as opposed to just quicker. Sun (and others) are taking a shot at chips with numerous centers and lower clock speeds (useful for web servers, not all that great for material science!). The expense of the encompassing room is a generous expense of the whole office.

Slide 13

Example: 40 Racks for Oxford We have a perfect area Lots of force Underground (no warmth from the sun and exceptionally secure). Heaps of headroom (false floor/roof for cooling frameworks) Basement no floor stacking limit Does not go through office space.

Slide 14

Bottom Line The exceptionally essential evaluation for the room, given the shell, is £80k. Including completely stacked cooling, UPS, power molding, fire assurance and so forth will likely take this to £400k after some time. Expense of 40 racks ~ £1.6 million Infrastructure costs: 25% of setup and up to half of running expenses.

Slide 15

Hang on! There are around 50000 PCs as of now in Oxford college alone. Accept 20000 are OK. As of now have a noteworthy server farm, with basically no base issues! The issue is programming – the Grid will misuse these assets and in this way spare millions in datacentre costs – medium term!

Slide 16

Thank you! Sun has a point by point paper at: http://www.sun.com/servers/white-papers/dc-arranging guide.pdf APC has various helpful white papers: http://www.apc.com/instruments/mytools/