Programming Configuration Management (SCM) Software Configuration Management (SCM) is a) the improvement and b) the use of measures and methods to the administration of all product ancient rarities delivered in the advancement and backing of programming. Significant Activities for effective SCM: Overall arranging Assigning obligations Rollout the arrangement for execution Implement and practice SCM Track the advancement and conform

Slide 2

Over-All Planning for SCM Major zones of arranging What is the procedure used and accordingly what are the ancient rarities that should be stocked and oversaw ? Who is in charge of the different parts of SCM ? What are the key strategies and approaches ? What apparatuses are required and how much different assets are required ? What is the effect of SCM and relationship to different exercises ?

Slide 3

Software Artifacts to be Managed Depending on the procedure, the distinguished points of reference and the submitted deliverables, the rundown of things that need to oversaw might be distinctive; however a large number of the accompanying are incorporated. Prerequisites and Change Requests reports Project, Quality, Test and different arrangement archives Design records Prototype code and archives Implementation Source and Object code Test Scenario archives Test cases and test information Internal and outside audit records and so on. The recognizable proof of what curios will be stocked and oversaw must be finished.

Slide 4

Types of Artifacts to be Managed Documents : Text, Diagrams, Spread sheets, and so on. Code : source code content, executable article code Data : information in some document or database Pictures : Bitmapped photographic pictures Audio : sound bytes of discourse, music, and so forth. Video : sound and pictures

Slide 5

Responsible gatherings for SCM Planning and Impact Analysis of SCM administration work force process, quality confirmation and arrangement organization staff programming execution faculty instruments faculty Designing the methodology and strategies process, quality certification and setup organization staff devices staff Implementing and running the apparatuses devices staff and arrangement organization Participants in actualizing SCM the complete advancement association subcontract faculty advisors clients

Slide 6

Key Procedures and Policies Naming Convention for the ancient rarities must have the capacity to permit the remarkable distinguishing proof of every antiquity that is stocked and oversaw. A case of 6 section item discharge naming tradition: pp.cc.vvv.rrr.ttt.fff where pp is the item code (if numeric then this gives 100 one of a kind items, for example, budgetary application, Java compiler, and so forth.) cc is the nation code (if numeric then this gives 100 nations, for example, US, French, Japanese, UK, German, Chinese, Spanish, and so on.) vvv is the rendition code (if numeric then this gives 1000 forms, for example, the MS Win98 variant, UNIX adaptation, LINUX adaptation, and so on.) rrr is the discharge code (if numeric then this gives 1000 discharges, for example, discharge 1, or discharge 2, and so on.) ttt is the sort code (if numeric this gives 1000 sorts of material, for example, outline doc, req. spec, experiment, source code, and so forth.) fff is the arrangement (if numeric this gives 1000 sorts of configuration, for example, content, spreadsheet, jpeg, twofold, and so forth.)

Slide 7

Key Procedures and Policies (cont.) Naming Convention and Promotion Scheme for item being worked on or in backing is somewhat distinctive. There must be an unmistakable guideline about advancing the relic from one phase of improvement or backing to another . Once the curio is elevated to a specific stage, it is bolted at that stage. It is likewise essential to advance related antiquities, for example, code, help content and experiments promot e advance . . Formally Inspected Functionally Tested Integration & System Tested Golden Copy Private Copies

Slide 8

Key Procedures and Policies (cont.) Micro perspective of strategies on control of an ancient rarity that should be made, gotten to, and erased. Make : a curio might be made surprisingly and appointed a one of a kind identifier Delete : an ancient rarity might be devastated and its remarkable identifier is come back to the pool. Access : an antique might be gotten to: perspective just : no contention in review alteration reason : there might be struggle in that different gatherings might get to the same material for adjustments, however the aftereffect of changes when returned will be out of sync. There should be registration and registration rules for ancient rarities

Slide 9

Key Procedures and Policies (cont.) System construct is a procedure where all the important code and code libraries are united and gathered and connected so that, as a set, the code will run. This procedure is critical amid testing of huge framework with various members and/or geologically conveyed members . Construct cycle might be day by day or week after week or semi-month to month All the progressions to the ancient rarities must be submitted preceding the fabricate cycle by means of a pre-set time span or by manufacture chairman\'s declaration. A construct device is very nearly an absolute necessity where relics that are not switched are gotten from one library and those that are adjusted are grabbed from another so extensive re-aggregation time might be spared.

Slide 10

Mechanisms for SCM Product "Forming and Release" control device that can deal with complex naming tradition and an intricate item stock plan. Antiquity creation, adjustment, advancement, locking, and erasure component which permits numerous and topographically dispersed members. Framework construct instrument that can make a complete or a part of the framework for both: steady and standard form cycles last "brilliant circle" for discharge

Slide 11

Some "Famous" SCM devices Rational Clear/Case - IBM CMVC - IBM PVCS – Merant Visual SourceSafe – Microsoft CVS – Open-Source

Slide 12

Some Interesting Tools Technology Related to SCM Storage and access of the curio: complete duplicate each time first duplicate however just the altered part for ensuing duplicates blend of one unique duplicate for every adaptation\'s first discharge yet simply the changed parts for resulting discharges Super look at calculation for seeking out the changed ancient rarities and the particular changes. Data linkages of : where is data X utilized (e.g. module fan-in sources or prerequisite to outline to code) who utilizes data X

Slide 13

Areas Related to SCM Change Management where all progressions must be: asked for endorsed finished put away All change administration exercises should be performed and records kept inside the SCM framework. A key antique expected to track changes is the change demand structure which relying upon its utilization might be perplexing or basic: e.g. demand accommodation source, reason, need, and date demand assessed impacts on calendar , cost, item, and so forth status : affirmed, denied, being developed and test, finished genuine effect on timetable, cost item, and so forth.

Slide 14

Areas Related to SCM Quality Assurance Management to gauge and track quality: e.g. relating number of changes to number of disappointments in blunder inclined examination relating " where utilized" data in SCM to fan-in and fan-out data Process & Project Management to track and measure profitability, cost, and calendar: e.g. utilizing linkage data to relate certain necessities to cost and calendar

Slide 15

SCM Roll-Out and Implementation All SCM related models and techniques are characterized and consented to by the association. All SCM devices are introduced and bolster work force are set up. The complete association and particularly the clients are prepared on the techniques and the instruments. Every one of the gatherings in the association has focused on utilizing the SCM framework and usage or pilot execution is begun with some sort of wide declaration or function.

Slide 16

Track SCM Usage Personnel, both specialized and regulatory, must be prepared to backing and track the use of SCM framework. Limit of assets Number of exchanges Number of issues found and determined and so forth. Reserves must be allotted for persistent upkeep and redesign of the SCM framework itself