Water Supply Dublin Region 13/07/2010

Slide 2

Greater Dublin Water Supply Area

Slide 3

The Water Cycle

Slide 4

DUBLIN REGION WATER SUPPLY THE FOUR SOURCES - 2010 Dublin\'s Water Supply BALLYCOOLEN CITY COUNCIL PLANT RESERVOIR LEIXLIP TRUNK MAIN WATER TREATMENT PLANT NON-CITY COUNCIL PLANT BELGARD RESERVOIR TRUNK MAIN COOKSTOWN STILLORGAN DUN LAOIRE SAGGART BALLYBODEN WATER TREATMENT PLANT & RESERVOIR BRAY KILDARE VARTRY WATER TREATMENT PLANT BALLYMORE EUSTACE WATER TREATMENT PLANT WICKLOW

Slide 5

Customers Local Authorities 6 Population 1.4 million(Region) 0.48 million(DCC) Households 576,000 (Region) 216,000 (DCC) Non Domestic 45,000 (Region) 18,000 (DCC)

Slide 6

Water Volumes 2009 Regional Demand 540Mld Regional Rated Production 518Mld FCC Production 153Mld DCC Production 365Mld Ballymore Eustace 275Mld Roundwood 75Mld Ballyboden 15Mld

Slide 7

January 21 st 1994

Slide 8

Raw Water Storage July 2010 Full Currently Poulaphouca 200 days 120 days Roundwood 200 days 160 days Bohernabreena 100 days 75 days Average 196 days 125 days Water protection will broaden these circumstances

Slide 9

Treated Water Storage Dublin Region Total Treated Water Storage 36 hrs. Treatment limit is restricted Water preservation is fundamental from the warm spells of Summer to the cool fronts of Winter to guarantee that provisions can be looked after r

Slide 10

Drinking Water Quality EPA Report for 2007 - Water quality great 98.9% consistence with quality parameters Any Non-consistence reportable to EPA Liason with HSE re any general wellbeing hazard 48 Parameters tried for consistence EU Drinking Water Regs.(SI 278 of 2007)

Slide 11

Water Sampling Raw water tests from streams. Crude water tests at plant admissions. Tests amid the treatment procedure. Treated water tests at plant outlets. Treated water tests at shopper taps.

Slide 12

DCC System Statistics Water Mains 2700km >50 years old 1300km >75 years old 700km

Slide 13

Sandblasted Water Main Sample

Slide 14

Leakage Reduction - Region Leakage 1994 43% Leakage 2009 29% Saving 39 Mld Housing Units 80,000 Industry (employments) 5,000

Slide 15

Most Leaks are elusive 1600mm Friday 13 th May 2005

Slide 16

Repair of the biggest water pipe in Ireland 1600mm Saturday 14 th May

Slide 17

Job finished with no disturbance to supply 1600mm Sunday 15 th May

Slide 18

2010 Charge for Water Supply & Waste Water Services to Non Domestic Users Consolidated Charge - €1.72/1000 lt. ( €0.00172/lt.) Consolidated Charge - €7.81/1000 lady. (€0.00781/lady.)

Slide 19

Water Use in the Home

Slide 20

Typical Costs @ €1.72/1000 Lt. Plant Hose (540 Lt/Hr.) €0.93 Bath (80Lt.) €0.14 Washing Machine Old (65 Lt.) €0.10 5 Minute Shower (35 Lt.) €0.07 Washing Machine New (45 Lt.) €0.07 Dishwasher (20 Lt.) €0.03 Toilet Flush (9Lt.) €0.02

Slide 21

Water Conservation Capital Budget - Watermains Rehab Revenue Budget - Awareness Raising - Water Bye Laws - Schools Program - DCC in-house Policy - Active spillage control