Engine Nacelle Halon Replacement FAA WJ Hughes Technical Center Point of Contact

Engine Nacelle Halon Replacement FAA WJ Hughes Technical Center Point of Contact
paly

This article provides contact information for Doug Ingerson, the Department of Transportation Federal Aviation Administration's point of contact at the WJ Hughes Technical Center Fire

About Engine Nacelle Halon Replacement FAA WJ Hughes Technical Center Point of Contact

PowerPoint presentation about 'Engine Nacelle Halon Replacement FAA WJ Hughes Technical Center Point of Contact'. This presentation describes the topic on This article provides contact information for Doug Ingerson, the Department of Transportation Federal Aviation Administration's point of contact at the WJ Hughes Technical Center Fire. The key topics included in this slideshow are . Download this presentation absolutely free.

Presentation Transcript


Slide1Engine Nacelle Halon Replacement,FAA, WJ Hughes Technical Center Point of Contact : Doug Ingerson Department of Transportation Federal Aviation Administration WJ Hughes Technical Center Fire Safety Section, AAR-422 Bldg 205 Atlantic City Int'l Airport, NJ 08405    USA tel: 609-485-4945 fax: 609-485-7074 email: Douglas.A.Ingerson@tc.faa.gov web page: http://www.fire.tc.faa.gov/ International Aircraft Systems Fire Protection Working Group Wilson, NC     17-18July2001 Federal Aviation Administration WJ Hughes Technical Center, Fire Safety Section, AAR-422 Atlantic City Int'l Airport, NJ 08405   USA

Slide2PROGRESS/CURRENT STATUSThree Major Topics for Review : Fire Extinguisher Test Section Gas Analyzer International Aircraft Systems Fire Protection Working Group Wilson, NC     17-18July2001 Federal Aviation Administration WJ Hughes Technical Center, Fire Safety Section, AAR-422 Atlantic City Int'l Airport, NJ 08405   USA

Slide3PROGRESS/CURRENT STATUS> Fire Extinguisher # Equilibrium subsystem being added i N2/agent mixture will be stabilized in this subsystem and then moved into the firex for pretest conditioning i the N 2 /agent solubility interaction will attain completion in a more controlled manner i removes the interaction from the detrimental exposure of the temperature extremes found in the firex i will minimize a circumstance potentially capable of producing inconsistent test results # Firex leak identified i bad seals found in the 1-1/4” releasing valve (pneumatically operated ball valve) i repair kit ordered; due on-site by Aug ‘01 i repair will be performed immediately upon receipt of parts International Aircraft Systems Fire Protection Working Group Wilson, NC     17-18July2001 Federal Aviation Administration WJ Hughes Technical Center, Fire Safety Section, AAR-422 Atlantic City Int'l Airport, NJ 08405   USA

Slide4PROGRESS/CURRENT STATUSFabricating the equilibrium subsystem International Aircraft Systems Fire Protection Working Group Wilson, NC     17-18July2001 Federal Aviation Administration WJ Hughes Technical Center, Fire Safety Section, AAR-422 Atlantic City Int'l Airport, NJ 08405   USA

Slide5PROGRESS/CURRENT STATUS> Test Section # Spray hot plate failed 8May01 during warm-up for fire sensitivity evaluations i problem found and corrected i pool hot plate corrected also i operational once again 20June01 # Fuel flow characterization for the spray and pool fire scenarios underway International Aircraft Systems Fire Protection Working Group Wilson, NC     17-18July2001 Federal Aviation Administration WJ Hughes Technical Center, Fire Safety Section, AAR-422 Atlantic City Int'l Airport, NJ 08405   USA

Slide6PROGRESS/CURRENT STATUS> Test Section (continued) # Fire sensitivity evaluations to occur for both fire scenarios between now and 10October01 i purpose ] rank combustion intensity dependent upon varying configurations for each fire scenario ] provide experience with the fire scenarios ] potentially ease the search for a “robust fire” i the evaluation of the residual scenario will include considerations for : ] freeboard (lip) height above the fuel ] pool surface area ] the orientation of the pool surface area i the evaluation of the spray scenario will focus on the combustion intensity as a function of the spatial relationship between the fuel nozzles and the associated engine core rib located downstream International Aircraft Systems Fire Protection Working Group Wilson, NC     17-18July2001 Federal Aviation Administration WJ Hughes Technical Center, Fire Safety Section, AAR-422 Atlantic City Int'l Airport, NJ 08405   USA

Slide7PROGRESS/CURRENT STATUS> Halonyzer II Modification # Currently on-going i problem solved i current device acceptably behaved during recent bench-top evaluation i the final configuration of the device is in fabrication i expect operational device in 4-6 weeks # Calibration to be accomplished after device is completely assembled # Device maintains original design concept i no excessive proof-of-concept required i no difficulty expected in acquiring test data International Aircraft Systems Fire Protection Working Group Wilson, NC     17-18July2001 Federal Aviation Administration WJ Hughes Technical Center, Fire Safety Section, AAR-422 Atlantic City Int'l Airport, NJ 08405   USA

Slide8PROGRESS/CURRENT STATUSBench-top configuration of the “new” analyzer International Aircraft Systems Fire Protection Working Group Wilson, NC     17-18July2001 Federal Aviation Administration WJ Hughes Technical Center, Fire Safety Section, AAR-422 Atlantic City Int'l Airport, NJ 08405   USA

Slide9PROGRESS/CURRENT STATUSPerspective View, New Connectivity Box for the Halonyzer II International Aircraft Systems Fire Protection Working Group Wilson, NC     17-18July2001 Federal Aviation Administration WJ Hughes Technical Center, Fire Safety Section, AAR-422 Atlantic City Int'l Airport, NJ 08405   USA 10.5” 20.4” 17.8”

Slide10PROGRESS/CURRENT STATUSInternal View, New Connectivity Box for the Halonyzer II International Aircraft Systems Fire Protection Working Group Wilson, NC     17-18July2001 Federal Aviation Administration WJ Hughes Technical Center, Fire Safety Section, AAR-422 Atlantic City Int'l Airport, NJ 08405   USA Power Supply Cooling fan Releasing Controls A-D boards Signal handling circuitry