This article discusses how to negotiate a good permit, highlighting the importance of understanding its basic components, terms and conditions, monitoring and reporting requirements, management responsibilities, and additional conditions and appendices. The article emphasizes that not all permits are created equal and provides essential tips to ensure compliance with the National Pollutant Discharge Elimination System (NPDES).

About Negotiating a Good Permit: Understanding the Basics of NPDES

PowerPoint presentation about 'Negotiating a Good Permit: Understanding the Basics of NPDES'. This presentation describes the topic on This article discusses how to negotiate a good permit, highlighting the importance of understanding its basic components, terms and conditions, monitoring and reporting requirements, management responsibilities, and additional conditions and appendices. The article emphasizes that not all permits are created equal and provides essential tips to ensure compliance with the National Pollutant Discharge Elimination System (NPDES).. The key topics included in this slideshow are NPDES permit, negotiating, terms and conditions, monitoring requirements, reporting, management responsibilities,. Download this presentation absolutely free.

Presentation Transcript


1. Negotiating a Good Permit Negotiating a Good Permit (Or, all permits are not created equal) (Or, all permits are not created equal) Katie Fendel, P.E. Katie Fendel, P.E. Leonard Rice Engineers, Inc. Leonard Rice Engineers, Inc. 303-455-9589 303-455-9589

2. Basic Components of an NPDES Permit Basic Components of an NPDES Permit Terms and Conditions Terms and Conditions Monitoring Requirements Monitoring Requirements Additional Monitoring Requirements Additional Monitoring Requirements Reporting Reporting Management Requirements/Responsibilities Management Requirements/Responsibilities Additional Conditions Additional Conditions Part III (Appendices) Part III (Appendices)

3. Terms & Conditions Terms & Conditions 1. 1. Service Area 2. 2. Design Capacity 3. 3. Expansion Requirements 4. 4. Facilities Operation 5. 5. Effluent Limitations 6. 6. Percentage Removal Requirements 7. 7. Compliance Schedules 8. 8. Industrial Waste Management 9. 9. Biosolids Limitations & Management Reqmts.

4. Regulatory Requirements in Permits Regulatory Requirements in Permits Owner/operator contact info Owner/operator contact info Location, quantity, quality of discharge Location, quantity, quality of discharge Effluent limitations, standards, & conditions Effluent limitations, standards, & conditions Monitoring, record-keeping, & reporting requirements Monitoring, record-keeping, & reporting requirements Notification requirements Notification requirements Compliance schedule if applicable Compliance schedule if applicable Submission of pertinent plans & specs in accordance w/ CS Submission of pertinent plans & specs in accordance w/ CS Emergency powers Emergency powers Inspection & entry Inspection & entry Transfer of permits Transfer of permits Planned alterations/additions Planned alterations/additions Duty to properly operate & maintain at all times/take steps to minimize violations Duty to properly operate & maintain at all times/take steps to minimize violations Domestic WWTP requirements (80/95%, pretreatment, flow measuring, contracts) Domestic WWTP requirements (80/95%, pretreatment, flow measuring, contracts) Bypass provisions Bypass provisions Upset provisions Upset provisions Need to halt not a defense Need to halt not a defense Sludge disposal requirements Sludge disposal requirements 307 toxic effluent standards 307 toxic effluent standards Compliance schedule (if applies) Compliance schedule (if applies) Duty to reapply Duty to reapply Extension if timely reapply Extension if timely reapply Information requests Information requests BMP requirements BMP requirements Signatory requirements Signatory requirements Requirement to keep records 3 yrs Requirement to keep records 3 yrs Other conditions Division requires Other conditions Division requires 5 year maximum duration (10 years if not subject to federal requirements) 5 year maximum duration (10 years if not subject to federal requirements) Permit modification, suspension, revocation, reissuance, termination Permit modification, suspension, revocation, reissuance, termination Stormwater, as applicable Stormwater, as applicable

5. How Effluent Limits Are Calculated How Effluent Limits Are Calculated Technology-Based Limits Technology-Based Limits Reg. No. 62, Regulations for Effluent Limitations Reg. No. 62, Regulations for Effluent Limitations Water Quality-Based Limits (WQBELs) Water Quality-Based Limits (WQBELs) Mass balance equation Mass balance equation February 2003 Determination of the Requirement to Include Water Quality Standards-Based Limits in CDPS Permits Based on Reasonable Potential February 2003 Determination of the Requirement to Include Water Quality Standards-Based Limits in CDPS Permits Based on Reasonable Potential Antidegradation-Based Limits (ADBELs) Antidegradation-Based Limits (ADBELs) Reg. 31, Basic Standards and Methodologies (Section 31.8) Reg. 31, Basic Standards and Methodologies (Section 31.8) Antidegradation Significance Determination for New or Increased Water Quality Impacts Procedural Guidance, December 2001, updated April 2002 Antidegradation Significance Determination for New or Increased Water Quality Impacts Procedural Guidance, December 2001, updated April 2002

6. Technology-Based Limits Technology-Based Limits Level the playing field Level the playing field From Effluent Limitations Regulation From Effluent Limitations Regulation BOD BOD TSS TSS BOD & TSS Removal Percentages BOD & TSS Removal Percentages Oil & Grease Oil & Grease pH pH Total Residual Chlorine Total Residual Chlorine Only use if the most stringent Only use if the most stringent

7. Water Quality-Based Effluent Limits Water Quality-Based Effluent Limits Where needed to meet water quality standards Where needed to meet water quality standards Based on mass balance equation: Based on mass balance equation: M2 = [(M3)(Q3) (M1)(Q1)] / Q2 M2 = [(M3)(Q3) (M1)(Q1)] / Q2 Q1 = Upstream low flow (1E3 or 30E3) Q1 = Upstream low flow (1E3 or 30E3) Q2 = Average daily effluent flow (design capacity) Q2 = Average daily effluent flow (design capacity) Q3 = Downstream flow ( Q1 + Q2 ) Q3 = Downstream flow ( Q1 + Q2 ) M1 = In-stream background pollutant concentrations at the existing quality M1 = In-stream background pollutant concentrations at the existing quality M2 = Calculated maximum allowable effluent pollutant concentration M2 = Calculated maximum allowable effluent pollutant concentration M3 = Maximum allowable in-stream pollutant concentration (water quality standards) M3 = Maximum allowable in-stream pollutant concentration (water quality standards)

8. WQBELs WQBELs Upstream background (M1) will vary based on regulatory definition of existing ambient water quality. Upstream background (M1) will vary based on regulatory definition of existing ambient water quality. 85th percentile for most pollutants 85th percentile for most pollutants 50th percentile for metals in total recoverable form 50th percentile for metals in total recoverable form Geometric mean for pathogens such as fecal coliform Geometric mean for pathogens such as fecal coliform Mass balance equation not applicable for nonconservative pollutants, including ammonia Mass balance equation not applicable for nonconservative pollutants, including ammonia Do use for fecal coliform/ e. coli , chlorine, nitrate, TIN Do use for fecal coliform/ e. coli , chlorine, nitrate, TIN For ammonia, use new AMTOX model For ammonia, use new AMTOX model Calculations incorporate nearby facilities & sources (dirty or clean) Calculations incorporate nearby facilities & sources (dirty or clean) Data needs and how to handle if inadequate data Data needs and how to handle if inadequate data

9. Antidegradation-Based Effluent Limits Antidegradation-Based Effluent Limits Why do we do this? Why do we do this? 3 parts to WQS: 3 parts to WQS: Beneficial uses Beneficial uses Criteria to protect BUs Criteria to protect BUs Antidegradation (3 categories) Antidegradation (3 categories) Subject to antidegradation requirements if: Subject to antidegradation requirements if: Designated outstanding waters or Designated outstanding waters or Undesignated Undesignated Dont need to do antidegradation review if: Dont need to do antidegradation review if: Designated use-protected Designated use-protected If undesignated, antidegradation review required if new or increased impacts are found to occur If undesignated, antidegradation review required if new or increased impacts are found to occur

10. Calculating ADBELs Calculating ADBELs 1 st establish baseline water quality (BWQ) 1 st establish baseline water quality (BWQ) BWQ = water quality as of 09/30/2000 BWQ = water quality as of 09/30/2000 At fully-mixed site downstream of discharge At fully-mixed site downstream of discharge 2 nd calculate Significant Concentration Threshold (SCT) 2 nd calculate Significant Concentration Threshold (SCT) SCT = additional amount of pollutant that will not cause significant degradation SCT = additional amount of pollutant that will not cause significant degradation SCT = 0.15 (WQS-BWQ) + BWQ SCT = 0.15 (WQS-BWQ) + BWQ Insignificant impacts include: Insignificant impacts include: New loads that use < 15% of remaining assimilative capacity (10% for bioaccumulative pollutants) New loads that use < 15% of remaining assimilative capacity (10% for bioaccumulative pollutants) When > 100:1 dilution at low flow (not applicable for bioaccumulative pollutants) When > 100:1 dilution at low flow (not applicable for bioaccumulative pollutants) Temporary impacts (not applicable for bioaccumulative pollutants) Temporary impacts (not applicable for bioaccumulative pollutants)

11. ADBELs ADBELs 3 rd , calculate ADBAC (antidegradation-based average concentration) 3 rd , calculate ADBAC (antidegradation-based average concentration) ADBAC = [(SCT)(Q3) (M1)(Q1)] / Q2 ADBAC = [(SCT)(Q3) (M1)(Q1)] / Q2 This is just the mass balance equation using the SCT in place of the water quality standard (M3)allows you to use up the 15% allowable increment (with no significant degradation) This is just the mass balance equation using the SCT in place of the water quality standard (M3)allows you to use up the 15% allowable increment (with no significant degradation) ADBELs are applied as a 2-year running average limit ADBELs are applied as a 2-year running average limit

12. Calculating Reasonable Potential Calculating Reasonable Potential Only get a limit if there is reasonable potential to violate Only get a limit if there is reasonable potential to violate First determine Multiplier First determine Multiplier Multiplier based on coefficient of variation and number of samples (table) Multiplier based on coefficient of variation and number of samples (table) Need minimum of 10 data points over 1 year Need minimum of 10 data points over 1 year Calculate Maximum Expected Pollutant Concentration Calculate Maximum Expected Pollutant Concentration (multiply highest concentration in data by the Multiplier) (multiply highest concentration in data by the Multiplier) For acute, use daily maximum data set For acute, use daily maximum data set For chronic, use monthly average data set For chronic, use monthly average data set Compare MEPC to Maximum Allowable Pollutant Concentration (MAPC) Compare MEPC to Maximum Allowable Pollutant Concentration (MAPC) MAPC equals WQBEL MAPC equals WQBEL

13. Monitoring or Permit Limits? Monitoring or Permit Limits? If MEPC > MAPC If MEPC > MAPC (or actual data value(s) > MAPC): (or actual data value(s) > MAPC): Permit limit needed Permit limit needed If 50% MAPC < MEPC < MAPC: If 50% MAPC < MEPC < MAPC: Only monitoring needed (no permit limit) Only monitoring needed (no permit limit) If MEPC < 50% MAPC If MEPC < 50% MAPC (and all data values < 50% MAPC): (and all data values < 50% MAPC): No permit limit or monitoring needed No permit limit or monitoring needed

14. So which limit do I get? So which limit do I get? Technology-based limit is highest limit you can get Technology-based limit is highest limit you can get If WQBELs apply, must take WQBEL if it is lower than current permitted load If WQBELs apply, must take WQBEL if it is lower than current permitted load When WQBEL is greater than current permitted load*: When WQBEL is greater than current permitted load*: 1. If antidegradation review was not required, can have WQBEL 1. If antidegradation review was not required, can have WQBEL 2. If antidegradation applies, then may have either: 2. If antidegradation applies, then may have either: 1. ADBEL (2-year running average limit), along with WQBEL (as maximum limit), or 1. ADBEL (2-year running average limit), along with WQBEL (as maximum limit), or 2. NIL (non-impact limit), which is a limit based on current permitted load and proposed design flow 2. NIL (non-impact limit), which is a limit based on current permitted load and proposed design flow (NIL = current limit if no change in design flow) (NIL = current limit if no change in design flow) * For those pollutants for which permit limits have not yet been established, an implicit load allocation is determined and an implicit permit limit is established. * For those pollutants for which permit limits have not yet been established, an implicit load allocation is determined and an implicit permit limit is established.

15. So which limit do I get? So which limit do I get? Can avoid ADBELs by accepting NILs (non-impact limits), which are limits based on current permitted load and proposed design flow. (If accept NILs, facility is not subject to antidegradation review: there is no new or increased load.) Can avoid ADBELs by accepting NILs (non-impact limits), which are limits based on current permitted load and proposed design flow. (If accept NILs, facility is not subject to antidegradation review: there is no new or increased load.) Can also avoid ADBELs by conducting an alternatives analysis per Section 31.8(3)(d), which could result in alternative antidegradation-based limits Can also avoid ADBELs by conducting an alternatives analysis per Section 31.8(3)(d), which could result in alternative antidegradation-based limits No limit if no reasonable potential No limit if no reasonable potential However, always get fecal coliform, total residual chlorine limits (& TIN & ammonia if needed for WQS) However, always get fecal coliform, total residual chlorine limits (& TIN & ammonia if needed for WQS) May currently be meeting these limits, based on treatment processes; absent limits, use of treatment may be discontinued May currently be meeting these limits, based on treatment processes; absent limits, use of treatment may be discontinued State finds this is reasonable potential State finds this is reasonable potential

16. Limits Selection Example Limits Selection Example Pollutant Pollutant Current Permit Limit Current Permit Limit (= NIL) (= NIL) (ug/l) (ug/l) Current Permitted Load Current Permitted Load (lb/day) (lb/day) New WQBEL New WQBEL (ug/l) (ug/l) New WQBEL Load New WQBEL Load (lb/day) (lb/day) ADBEL ADBEL (ug/l) (ug/l) As, TR As, TR 11.0 11.0 0.39 0.39 205 205 7.4 7.4 39 39 Cu, diss Cu, diss 46 46 1.6 1.6 69 69 2.5 2.5 27 27 NH3, tot NH3, tot (March) (March) 2.7 2.7 97 97 4.4 4.4 158 158 3.6 3.6 CN, free CN, free 6.0 6.0 0.22 0.22 5.0 5.0 0.18 0.18 5.0 5.0

17. WET Requirements WET Requirements Colorado WQCD Biomonitoring Guidance Document, July 1, 1993 (revised 06/01/02, 09/27/04, 05/01/06) Colorado WQCD Biomonitoring Guidance Document, July 1, 1993 (revised 06/01/02, 09/27/04, 05/01/06) At application, must submit acute WET test results if: At application, must submit acute WET test results if: 1 MGD design flow 1 MGD design flow Have/required to have approved pretreatment program Have/required to have approved pretreatment program Industrial majors Industrial majors Other considerations (certain effluent characteristics, TMDLs, facility history/compliance record) Other considerations (certain effluent characteristics, TMDLs, facility history/compliance record) Must submit chronic WET results if: Must submit chronic WET results if: If stream low flow : effluent design flow < 10:1 and receiving stream is Class 1 aquatic life or Class 2 aquatic life with all appropriate aquatic life numeric standards If stream low flow : effluent design flow < 10:1 and receiving stream is Class 1 aquatic life or Class 2 aquatic life with all appropriate aquatic life numeric standards

18. WET Limits: Acute or Chronic? WET Limits: Acute or Chronic? Acute conditions apply if: Acute conditions apply if: Chronic IWC 9.1* OR Chronic IWC 9.1* OR Stream segment is not classified as Class 1 Aquatic Life or Class 2 Aquatic Life use with all of the appropriate aquatic life numeric standards Stream segment is not classified as Class 1 Aquatic Life or Class 2 Aquatic Life use with all of the appropriate aquatic life numeric standards *(same as stream chronic low flow : facility flow 10:1) *(same as stream chronic low flow : facility flow 10:1) Chronic conditions apply if: Chronic conditions apply if: Chronic IWC 9.1** AND Chronic IWC 9.1** AND Stream segment is classified as Class 1 Aquatic Life or Class 2 Aquatic Life use with all of the appropriate aquatic life numeric standards Stream segment is classified as Class 1 Aquatic Life or Class 2 Aquatic Life use with all of the appropriate aquatic life numeric standards **(same as stream chronic low flow : facility flow 10:1) **(same as stream chronic low flow : facility flow 10:1) Chronic Instream Waste Concentration (IWC) = Chronic Instream Waste Concentration (IWC) = [Facility Flow (FF)/(Stream Chronic Low Flow (annual) + FF)] X 100% [Facility Flow (FF)/(Stream Chronic Low Flow (annual) + FF)] X 100%

19. Monitoring or WET Limits? Monitoring or WET Limits? No monitoring/no limit if no demonstrated WET and no known pollutants of significance No monitoring/no limit if no demonstrated WET and no known pollutants of significance Monitoring if no demonstrated WET, but are some pollutants of significance (or variable effluent quality) Monitoring if no demonstrated WET, but are some pollutants of significance (or variable effluent quality) WET monitoring and limits if WET demonstrated or factors that show reasonable potential for WET WET monitoring and limits if WET demonstrated or factors that show reasonable potential for WET Limits effective 3 years for existing facilities; Limits effective 3 years for existing facilities; 90 days for new facilities 90 days for new facilities

20. Acute Conditions Acute Conditions Shall be no LC50 at effluent concentrations 100% effluent Shall be no LC50 at effluent concentrations 100% effluent (if no instantaneous mixing is provided) (if no instantaneous mixing is provided)

21. Chronic Conditions Chronic Conditions 2 Chronic Lethality WET Limits: 2 Chronic Lethality WET Limits: 1. Shall not be any statistically significant difference in toxicity between control & any effluent concentrations IWC 1. Shall not be any statistically significant difference in toxicity between control & any effluent concentrations IWC 2. IC25 (inhibition concentration) shall be IWC 2. IC25 (inhibition concentration) shall be IWC Both look at full range of toxicity (lethality, growth and reproduction) Both look at full range of toxicity (lethality, growth and reproduction) If statistically significant difference in lethality (95% confidence) between the control and any effluent conc. IWC and if lethality IC25 < the IWC, permittee required to follow automatic compliance schedule if the observed toxicity is due to organism lethality If statistically significant difference in lethality (95% confidence) between the control and any effluent conc. IWC and if lethality IC25 < the IWC, permittee required to follow automatic compliance schedule if the observed toxicity is due to organism lethality If toxicity due to differences in growth of the fathead minnows or the reproduction of the Ceriodaphnia, no immediate action required If toxicity due to differences in growth of the fathead minnows or the reproduction of the Ceriodaphnia, no immediate action required May form the basis for reopening permit and including additional chronic toxicity WET limits or other requirements May form the basis for reopening permit and including additional chronic toxicity WET limits or other requirements

22. WET Testing Relief WET Testing Relief After 1 year of testing during which no toxicity demonstrated, permittee may request relief on future monitoring After 1 year of testing during which no toxicity demonstrated, permittee may request relief on future monitoring Divisions call Divisions call Requires permit modification Requires permit modification For acute testing, may request use of 6 organisms allowed by EPA For acute testing, may request use of 6 organisms allowed by EPA For chronic testing, only allowable species are Ceriodaphnia dubia and fathead minnows For chronic testing, only allowable species are Ceriodaphnia dubia and fathead minnows

23. Basic Pretreatment Requirements Basic Pretreatment Requirements Minor POTWs Minor POTWs Responsibility to protect POTW Responsibility to protect POTW General discharge prohibitions General discharge prohibitions Industrial categorical limitations Industrial categorical limitations Notification requirements (new introductions) Notification requirements (new introductions) Reopener Reopener State/EPA direct enforcement ability for IUs State/EPA direct enforcement ability for IUs Majors Without Pretreatment Programs Majors Without Pretreatment Programs Same as above PLUS Same as above PLUS Annual sampling for metals/cyanide/phenols Annual sampling for metals/cyanide/phenols

24. Basic Pretreatment Requirements Basic Pretreatment Requirements DWTWs With Approved Pretreatment Programs DWTWs With Approved Pretreatment Programs Pretreatment influent/effluent monitoring (including toxics screen & biosolids screen) Pretreatment influent/effluent monitoring (including toxics screen & biosolids screen) Operate full pretreatment program (including legal authorities, general prohibitions/local/categorical limits, IU permits/control mechanisms, sampling, inspections, enforcement program, ERP, staffing/financial support, SIU violators annual publication, IU updates, spill/slug control evaluations, RCRA notification responsibilities, and others identified on last slide) Operate full pretreatment program (including legal authorities, general prohibitions/local/categorical limits, IU permits/control mechanisms, sampling, inspections, enforcement program, ERP, staffing/financial support, SIU violators annual publication, IU updates, spill/slug control evaluations, RCRA notification responsibilities, and others identified on last slide)

25. Recent/Upcoming Changes & Potential Effects on Permits Recent/Upcoming Changes & Potential Effects on Permits Basic Standards Changes Basic Standards Changes Ammonia Ammonia Temperature criteria Temperature criteria Metals criteria Metals criteria New effluent-dependent/effluent-dominated definitions New effluent-dependent/effluent-dominated definitions Decoupling & antidegradation requirements Decoupling & antidegradation requirements Others Others Nutrient standards Nutrient standards Growth related sub-lethal WET Growth related sub-lethal WET

26. Ammonia Criteria Ammonia Criteria Adopted EPAs 1999 Ammonia Update Adopted EPAs 1999 Ammonia Update For cold water (salmonids present, ELSP all year), generally relaxed standards For cold water (salmonids present, ELSP all year), generally relaxed standards For warm water (salmonids absent, ELSP April 1 August 31), generally more stringent standards For warm water (salmonids absent, ELSP April 1 August 31), generally more stringent standards Hearing 03/07 to consider changing standards for all basins Hearing 03/07 to consider changing standards for all basins SOBP also discusses adoption of temporary modifications to provide reasonable & adequate time for municipalities to address planning, financing, & construction SOBP also discusses adoption of temporary modifications to provide reasonable & adequate time for municipalities to address planning, financing, & construction

27. Temperature Criteria Temperature Criteria WQCC adopted new temperature criteria in 2005, effective 12/31/07 WQCC adopted new temperature criteria in 2005, effective 12/31/07 Rulemaking hearing scheduled for 01/08/07 to reconsider temperature criteria based on input from panel of experts Rulemaking hearing scheduled for 01/08/07 to reconsider temperature criteria based on input from panel of experts

28. Metals Criteria Metals Criteria Metals criteria (table value standards) changed for: Metals criteria (table value standards) changed for: Aluminum Aluminum Antimony Antimony Arsenic Arsenic Cadmium Cadmium Uranium Uranium Zinc Zinc On a site-specific basis, could significantly affect future permit limits for: On a site-specific basis, could significantly affect future permit limits for: Arsenic Arsenic Cadmium Cadmium Uranium Uranium Zinc Zinc

29. New Definitions New Definitions Effluent-dependent stream: would be ephemeral without the presence of wastewater effluent, but has continuous or periodic flows for all or a portion of its reach as the result of the discharge Effluent-dependent stream: would be ephemeral without the presence of wastewater effluent, but has continuous or periodic flows for all or a portion of its reach as the result of the discharge Effluent-dominated stream: would be intermittent or perennial without the presence of wastewater effluent whose flow for the majority of the time is primarily attributable to the discharge of treated water (i.e., > 50% of the flow consists of treated wastewater for at least 183 days annually, for 8 out of 10 years) Effluent-dominated stream: would be intermittent or perennial without the presence of wastewater effluent whose flow for the majority of the time is primarily attributable to the discharge of treated water (i.e., > 50% of the flow consists of treated wastewater for at least 183 days annually, for 8 out of 10 years)

30. Decoupling Decoupling Automatic decoupling of Cold Water Aquatic Life Class 2 and Use Protected Automatic decoupling of Cold Water Aquatic Life Class 2 and Use Protected Opportunity to decouple Warm Water Aquatic Life Class 2 and Use Protected Opportunity to decouple Warm Water Aquatic Life Class 2 and Use Protected Couples Effluent-Dominated and Effluent- Dependent with Use Protected Couples Effluent-Dominated and Effluent- Dependent with Use Protected

31. Permitting Process (What do I get to see when?) Permitting Process (What do I get to see when?) May request pre-application conference/ May request pre-application conference/ site inspection site inspection 60 days to apply once notified 60 days to apply once notified 45 days for completeness determination 45 days for completeness determination Pre-public notice draft review (WQA, Rationale) Pre-public notice draft review (WQA, Rationale) Public notice of draft permit Public notice of draft permit 30 day comment period (unless public meeting) 30 day comment period (unless public meeting)

32. Basics Basics Permit required for any point source discharge of pollutants to a water of the State (or U.S.) Permit required for any point source discharge of pollutants to a water of the State (or U.S.) State waters = any and all surface and subsurface waters which are contained in or flow through this State; does not include waters in sewage systems, waters in treatment works of disposal systems, waters in potable water distribution systems, and all water withdrawn for use until use and treatment have been completed State waters = any and all surface and subsurface waters which are contained in or flow through this State; does not include waters in sewage systems, waters in treatment works of disposal systems, waters in potable water distribution systems, and all water withdrawn for use until use and treatment have been completed

33. State Exemptions State Exemptions Activities such as diversion, carriage, and exchange of water from or into streams, lakes, reservoirs, or conveyance structures or storage of water in or release of water from lakes, reservoirs, or conveyance structures, in the exercise of water rights shall not be considered to be point source discharges of pollution Activities such as diversion, carriage, and exchange of water from or into streams, lakes, reservoirs, or conveyance structures or storage of water in or release of water from lakes, reservoirs, or conveyance structures, in the exercise of water rights shall not be considered to be point source discharges of pollution Nothing, however, exempts any point source discharger which generates wastewater effluent from the requirement of obtaining a permit. Nothing, however, exempts any point source discharger which generates wastewater effluent from the requirement of obtaining a permit. Cannot require permit for flow or return flow of irrigation water (except as required by Federal or State Acts) Cannot require permit for flow or return flow of irrigation water (except as required by Federal or State Acts)

34. Discharges to Ditches/Other Man-Made Conveyance Structures Discharges to Ditches/Other Man-Made Conveyance Structures Permit for discharge to ditch shall include provisions to: Permit for discharge to ditch shall include provisions to: Protect beneficial uses made of water (decreed or in existence prior to inception) Protect beneficial uses made of water (decreed or in existence prior to inception) Comply with any applicable WQS that may be affected by discharge (including downstream) Comply with any applicable WQS that may be affected by discharge (including downstream)

35. Recent Court Decisions/Rules Recent Court Decisions/Rules South Florida Water Management District v. Miccosukee Tribe of Indians et al. South Florida Water Management District v. Miccosukee Tribe of Indians et al. (March 23, 2004 U.S. Supreme Court Decision) (March 23, 2004 U.S. Supreme Court Decision) Agency Interpretation on Applicability of Section 402 to Water Transfers Agency Interpretation on Applicability of Section 402 to Water Transfers (August 5, 2005 EPA memorandum) (August 5, 2005 EPA memorandum) National Pollutant Discharge Elimination System (NPDES) Water Transfers Proposed Rule National Pollutant Discharge Elimination System (NPDES) Water Transfers Proposed Rule (June 7, 2005 Federal Register Notice) (June 7, 2005 Federal Register Notice)

36. Thank You! Katie Fendel, P.E. Project Manager Leonard Rice Engineers, Inc. Thank You! Katie Fendel, P.E. Project Manager Leonard Rice Engineers, Inc.