Gas Turbine Overhaul Plan (GTOP) Software for Efficient Maintenance and Documentation

Gas Turbine Overhaul Plan (GTOP) Software for Efficient Maintenance and Documentation
paly

EPRI and Iberdrola collaborated to develop the GTOP software, which facilitates the comprehensive documentation of hot section inspections and overhaul processes for gas turbines. The software enables efficient planning, management, and documentation of major overhaul tasks, leading to increased control over maintenance operations and the ability to maintain a large fleet of gas turbines.

About Gas Turbine Overhaul Plan (GTOP) Software for Efficient Maintenance and Documentation

PowerPoint presentation about 'Gas Turbine Overhaul Plan (GTOP) Software for Efficient Maintenance and Documentation'. This presentation describes the topic on EPRI and Iberdrola collaborated to develop the GTOP software, which facilitates the comprehensive documentation of hot section inspections and overhaul processes for gas turbines. The software enables efficient planning, management, and documentation of major overhaul tasks, leading to increased control over maintenance operations and the ability to maintain a large fleet of gas turbines.. The key topics included in this slideshow are Gas Turbine Overhaul Plan, GTOP software, Iberdrola, hot section inspection, maintenance documentation, gas turbine fleet maintenance,. Download this presentation absolutely free.

Presentation Transcript


1. 2009 Electric Power Research Institute, Inc. All rights reserved. Gas Turbine Overhaul Plan (GTOP) Software Gas Turbine Overhaul Plan (GTOP) Software Working with Iberdrolas Center for Monitoring, Diagnosis and Simulation (CMDS), EPRI developed GTOP software to fully document a hot section inspection for a 9FA frame combustion turbine. CMDS and EPRI validated application of GTOP Castellon Station and documenting the hundreds of tasks related to machine disassembly, inspection, reassembly, and start-up. With GTOP, Iberdrola was better able to plan, manage, and document this major overhaul. In addition, use of the software created a foundation for Iberdrola to increasingly take direct responsibility for maintaining its own large fleet of advanced gas turbines. Dr. Jos A. Tagle, Mara Martn, Antonio Caruana, Jos Miguel Berrio Iberdrola

2. 2009 Electric Power Research Institute, Inc. All rights reserved. PlantView Automated Training Manager PlantView Automated Training Manager Our company continually strives for operational excellence and [Operational Excellence Program] OEP is fundamental to our continued success. This initiative saved the company hundreds of thousands of dollars in development costs due of the creativity, skill, and determination of the people involved, and it has created a legacy that ensures Progress Energy will have future generations of highly skilled operators. Charlie Gates, Progress Energy

3. 2009 Electric Power Research Institute, Inc. All rights reserved. Coal Flow Measurement Coal Flow Measurement Luminant hosted a field test program to assess coal distribution to burners at its Martin Lake Power Station. The test program adopted concepts learned from studies conducted at EPRIs Coal Flow Measurement and Control Laboratory. By employing an advanced coal flow meter, which enables real-time assessment of coal distribution from one mill, the results of the field test program allowed plant personnel to gain insights as to how the system is currently operating and to devise a strategy for improving coal distribution to specific burners. Pete Ulvog, Luminant

4. 2009 Electric Power Research Institute, Inc. All rights reserved. Field Evaluation of Continuous Mercury Monitors (CMMs) Field Evaluation of Continuous Mercury Monitors (CMMs) E.ON U.S. hosted a field evaluation of CMMs at its Trimble County Power Plant to resolve a number of specific technical issues related to sample acquisition, calibration, operation, instrument certification, and reliability. The field evaluations offered the utility first-hand experience with CMM technology. The test results will help enable E.ON to make informed purchase decisions that result in reduced technical and economic risk and ensure cost-effective compliance with the EPA reporting requirements. John Moffett, Tom Crutcher, Jeff Slocum, Trent Henderson, Nick Payne E.ON U.S.

5. 2009 Electric Power Research Institute, Inc. All rights reserved. Integrated Boiler Tube Failure Reduction/Cycle Chemistry Improvement Program Integrated Boiler Tube Failure Reduction/Cycle Chemistry Improvement Program TNB implemented EPRIs Integrated Boiler Tube Failure Reduction/Cycle Chemistry Improvement Program (BTFR/CCIP) and produced plant-specific Guidelines for implementation at their plants. Through improvements in the overall boiler operational and maintenance program, TNB has significantly reduced the rate of boiler tube failures to less than 1% of the plant availability loss over the past few years. This has contributed to TNBs world-class performance in achieving the overall unplanned outage rate of less than 3%. Shahrir Abdul Latiff, Tenaga Nasional Berhad, Malaysia

6. 2009 Electric Power Research Institute, Inc. All rights reserved. Combustion Turbine Repair and Coating Guidelines Combustion Turbine Repair and Coating Guidelines Taiwan Power applied EPRIs Combustion Turbine Repair and Coating Guidelines to assess the condition and suitable repair approach for their fleet of Siemens V84.2 model combustion turbines. By developing an in-house technical competency on repair processes and their application to the specific design features of the V84.2 hot section, Taiwan Power extended the economic useful life of expensive super alloy gas turbine components and continue to run the components as is over an extended service interval or perform repair/recoating in-house. Tsung-Hsiao Wu, Taiwan Power

7. 2009 Electric Power Research Institute, Inc. All rights reserved. Crack Growth Analysis Crack Growth Analysis DTE Energy utilized crack growth analysis methods developed by EPRI to demonstrate that crack accumulation in boiler drums at the utilitys St. Clair Power Plant could be addressed through monitoring and inspection rather than costly weld repairs. By utilizing the continuing inspections of the boiler drums, DTE Energy was able to avoid weld repairs estimated at $40K to $50K per drum. The unit was able to return to service without extending the outage time. In addition, future repairs of the welds that often re-crack will be avoided. Dr. Richard Lynch, DTE Energy

8. 2009 Electric Power Research Institute, Inc. All rights reserved. Quick Silver Emission Monitor (Quick-SEM) Quick Silver Emission Monitor (Quick-SEM) AEP supported development of Quick-SEM, a sorbent trap sampling methodology for measuring mercury in power plant stacks. The Quick-SEM approach became the basis for both the EPA Appendix K method for routine compliance monitoring for mercury as well as the EPA Reference Method 30B for certification of continuous mercury monitors in the Clean Air Mercury Rule (CAMR). The EPA Method 30B and the sorbent trap sampling methodology have proven to be workable and accurate, says AEPs Manojit Sukul. Although CAMR, including the App. K method, has been vacated, EPA is expected to promulgate a new rule in the near future. Industry experts believe that new rule will include some form of mercury monitoring. For many utilities, the sorbent trap sampling methodology will provide an alternate low-capital-cost approach, as compared to the installation of continuous mercury monitors. Manojit Sukul, AEP

9. 2009 Electric Power Research Institute, Inc. All rights reserved. Intelligent Sootblowing (ISB) Intelligent Sootblowing (ISB) A demonstration of ISB technology at NRG Energys W.A. Parish Plant, conducted as part of an EPRI-sponsored project, provided a unique opportunity to identify and quantify all of the technologys benefits. Total plant-wide annual savings attributable to ISB amounted to more than $15 million. These savings resulted from extended tube life, improved boiler efficiency, and reduced O&M costs. Numerous other benefits were documented qualitatively. The analysis concluded that a return on investment of less than a year can be expected in deploying ISB technology. Robert Osco, NRG Energy

10. 2009 Electric Power Research Institute, Inc. All rights reserved. Mercury Control Technology Mercury Control Technology Using EPRI information and data from other test sites, Xcel Energy selected the mercury controls that held most promise at their power plants for cost- effectively meeting emission limits while preserving ash sales. To evaluate their performance at full scale, they conducted demonstrations at Harrington and Tolk Stations. These demonstrations evaluated the performance of sorbent injection and boiler bromide addition (marketed as KNX TM by Alstom) with and without activated carbon injection. Results of these tests will help Xcel Energy compare the mercury removal effectiveness of several sorbents and KNX TM to determine the best approach for reaching 70% mercury removal while still maintaining fly ash sales. Ron Dutton, Xcel Energy

11. 2009 Electric Power Research Institute, Inc. All rights reserved. Geologic Storage of Carbon Dioxide Geologic Storage of Carbon Dioxide Southern Company led this first-of-its-kind pilot demonstration to explore the potential for geologic storage of CO 2 . The project, was managed by EPRI, the Southern States Energy Board, and Advanced Resources International. The project injected CO 2 into a saline reservoir near Mississippi Powers Victor J. Daniel Plant in order to demonstrate the technology for permanent underground sequestration of CO 2 . These tests have already helped to validate and refine the effectiveness of CO 2 sequestration in geologic formations and have demonstrated the effectiveness of monitoring technologies to measure CO 2 movement through a formation. Keith Harrison, Richard Esposito Southern Company

12. 2009 Electric Power Research Institute, Inc. All rights reserved. Plant Managers Forum Plant Managers Forum As part if its O&M Excellence (OMX) Initiative, EPRI conducted series of Plant Manager Workshops to bring together utility plant managers. The goal of this forum is to utilize the groups shared wisdom and experience in order to formulate actionable solutions for improving plant performance. In August 2007, the first in the planned series of workshops provided a unique opportunity for 20 utility plant managers from 12 utilities to meet together to share experiences and best practices related to operations and maintenance (O&M). Ive attended a number of utility conferences over the past 25 years, and I must say the EPRI Plant Managers Workshop provided the most practical approach to how business is conducted at a power plant. Frank Wszelaki, DTE Energy

13. 2009 Electric Power Research Institute, Inc. All rights reserved. Valve Packing Demonstration Unit (VPDU) Valve Packing Demonstration Unit (VPDU) Hands-on training with the VPDU ensured that ESB Power Generation plant personnel employ proper packing assembly and loading techniques in the field. Proper practices, in turn, contribute to improved plant safety, operability, and availability. In addition, VPDU training can aid plant engineers in working with valve packing suppliers to select the best products for each application, update plant maintenance procedures to reflect the latest knowledge, and assess the root cause of leaks from valve packing. Richard Sheehan, David Willis, Pat Fogarty ESB Electricity Supply Board of Ireland

14. 2009 Electric Power Research Institute, Inc. All rights reserved. Fossil Maintenance Application Center Guides Fossil Maintenance Application Center Guides FirstEnergy initiated a program that requires newly hired maintenance mechanics who lack prior experience with coal generating station equipment to self-train using the FMAC guides. By using these guides, new hires can train themselves at their own pace on some of the operation and maintenance processes and procedures specific to power plant equipment and operations. Using the FMAC guides as a training tool helps newly hired employees learn a great deal about power plant operations in a relatively short period of time. FirstEnergy

15. 2009 Electric Power Research Institute, Inc. All rights reserved. CHECUPweb CHECUPweb New Brunswick Power Generation incorporated EPRIs CHECUPweb 1.1 software into their flow-accelerated corrosion program during scheduled outages in 2007 to calculate the wall loss of single-phase piping segments and components since plant startup. Application of the software enabled them to compile a clear, prioritized inspection sample. It is estimated that at least two in-service failures in heater drains were avoided on each of the two units at NBPGs Dalhousie Plant. A conservative estimate of the value of lost revenue that was avoided based on todays fuel prices is $900,000. Robert Griffin, New Brunswick Power Generation